|
Project 335i -
Preparations |
Project
Platform (e30)
Preparations
- Remove the Driveline (Engine, Transmission, Driveshaft, ECU, Exhaust, etc)
- Relocate the Battery to the
Rear (Cabrio, Touring, 316-320i)
Donor Vehicle (X35i)
Preparations
- Remove the Driveline (Engine, Transmission, Driveshaft, ECU, Exhaust, etc)
- Clean Engine and Transmission's
Exterior Surfaces
- Check the Tightness of Any Parts that
May be Loose (Oil Pan, etc)
- Change any Worn Parts (Clutch,
Water Pump)
- If Necessary,
Change
Connecting Rods (Material $175)
Installation Preparations
- If an Older Engine is to be
Used: Install the e34/e32 Oil Pan/Pump
- Lift the Engine and
Transmission into the Engine Compartment
- If the Firewall is to be
Altered: Mark and Alter it Here
- Adapt the Radiator Brackets
and Check the Distance to the Radiator
- Manufacture or Purchase
a Suitable Transmission Bracket
- Organize/Layout the Engine Compartment
(coolant overflow tank, etc)
- Have the Driveshaft Shortened
and Balanced
- Shorten the Shift Linkage
- Manufacture an Exhaust System
Assembly
- Lift the Engine and
Transmission, with mounting brackets attached, into the Car
- Affix the Motor Mount Brackets
- Affix the Transmission Mount Brackets
-
Attach the Driveshaft and the Shift
Linkage
- Install the Exhaust
-
Install the Radiator and Fill it with Coolant
-
Mount the Coolant Overflow Tank, etc
- Manufacture the Electrical Connection
Questions,
Comments? |